In brief: Fleet charging should start with how vehicles work rather than how many chargers can fit in a car park. The critical factors are routes, energy use, return times, parking windows and the reliability that operations require.
A depot may support several vehicles with scheduled charging, but that depends on duty cycles and operational risk. Modelling demand avoids both underbuilding and unnecessarily expensive infrastructure.
Map the vehicle schedule
Identify how long each vehicle is parked, how many return simultaneously and when it must next depart. Build in contingency for disrupted operations and seasonal peaks.
Assess electricity demand
An electrical survey can identify capacity, load management options, meter limitations and whether the network operator needs to be involved. Consider charging alongside other site loads.
Plan for change
Vehicle replacement, additional shifts and higher utilisation may alter requirements. Discuss expansion routes, spare ducting and future charger management before the initial installation.
Next steps
Compare your site requirements with current guidance, obtain advice from an appropriately qualified professional and consider requesting an installation assessment. For funding questions, consult the official government source before applying.
Official source: GOV.UK scheme guidance. Information reviewed 16 November 2026; the rules may change. This website is independent and does not administer government grants.