← Knowledge HubWorkplace Charging Knowledge Hub

7kW, 22kW or rapid charging: what suits a workplace?

Understand how different charger power ratings relate to parking duration and site capacity.

Published: 16 September 2026

In brief: A charger’s advertised power is not the same as the charging power every vehicle will accept. Vehicle onboard chargers, batteries and available electricity supply can limit the rate.

For vehicles parked for much of a working day, lower-power AC charging may be adequate. Sites with short turnarounds may need faster charging, although this can increase electrical and operational complexity.

7kW AC charging

This is common in locations where vehicles park for several hours. A typical single-phase supply and charger configuration may be suitable, subject to survey and vehicle capability.

22kW AC charging

This generally requires suitable three-phase supply. Some cars cannot accept the full 22kW through AC charging, so check the intended vehicle mix before paying for higher-power equipment.

Rapid DC charging

DC chargers can deliver faster charging for compatible vehicles but usually cost more and require stronger electrical infrastructure. They can suit high-utilisation or time-sensitive operations where the demand justifies them.

Next steps

Compare your site requirements with current guidance, obtain advice from an appropriately qualified professional and consider requesting an installation assessment. For funding questions, consult the official government source before applying.

Official source: GOV.UK scheme guidance. Information reviewed 16 November 2026; the rules may change. This website is independent and does not administer government grants.

Editorial information: This is an independent information guide, not official government advice. Content was prepared using publicly available guidance and should be checked against the linked primary sources before decisions are made.
← Return to Knowledge Hub